CommercialSolarCostUK Get a Quote

What Is kWp, and Why Is Commercial Solar Priced per kWp?

kWp (kilowatt-peak) is the rated DC power of a solar array under standard test conditions. It is the unit commercial solar is priced in because it measures how much panel you are buying, whatever the roof, the inverter or the weather. A 100kWp array has panels that add up to 100 kilowatts on the datasheet, around 220 panels of 455W. Divide a quote's price by its kWp and you can compare it with any other quote, and with the £650–£1,100 per kWp range this site publishes for 2026.

Want a number for your building? Send your roof and bill details for an indicative price band.

What kWp means

The "peak" in kilowatt-peak refers to the test, not to a moment on your roof. Manufacturers rate every panel under standard test conditions (STC): a constant 1,000W of sunlight per square metre on the panel at a panel temperature of 25°C. The European Commission's PVGIS tool defines installed peak power in exactly those terms and asks for it in kWp (PVGIS user manual). Real roofs rarely see those conditions, so a 100kWp array does not output 100kW most of the time. What the rating gives you is a fixed, comparable measure of the panels themselves.

That is why a price per kWp is the working number for commercial solar. It does not change with roof orientation, local sunshine or what you pay for electricity, so it isolates what you are paying for the hardware, installation and connection. Those other factors decide what the system earns, and they are separate questions.

kWp, kW and kWh: three units that get mixed up

A commercial quote can carry all three, and mixing them up is the most common way to misread one.

UnitWhat it measuresWhere you meet itExample
kWp (kilowatt-peak)The DC power the panels are rated to produce under standard test conditionsPanel datasheets, the price per kWp on a quote, PVGIS inputs, DESNZ cost data (per kW)220 panels × 455W = 100.1 kWp
kW (kilowatt, AC)Power the inverter can deliver to the building and the gridInverter datasheets, the G99 grid application, planning thresholdsA "100kW" inverter
kWh (kilowatt-hour)Energy: power over timeYour electricity bill, annual generation, export paymentsAbout 85,000–95,000 kWh a year from 100kWp on a good low-tilt roof

The two power ratings often differ. Panels are frequently rated at more DC power than the inverter can pass on, so an array described as "100kW" can be 100kW of inverter with more than 100kWp of panels behind it. The price per kWp should always use the panel total from the panel schedule, not the headline. Energy is a different quantity again: how many kWh each kWp produces depends on the roof. PVGIS (SARAH3 radiation data, 14% system losses) returns 772 kWh per kWp a year for a south-facing 10° array in Glasgow and 946 in Cardiff; the cost per kWp benchmark has the full table for ten cities.

From kWp to panels and roof area

Panel counts follow from simple arithmetic. At 455W per panel, 1kWp is 2.2 panels, so 30kWp is about 66 panels, 100kWp about 220 and 500kWp about 1,099. Roof area follows from the layout: this site's size guides assume 4.5–5.0 square metres of clear roof per kWp, so a 100kWp system wants 450–500 square metres. These are labelled arithmetic, not measured roofs. Spacing for flat-roof tilt frames, walkways, rooflights, plant and the access and fire-safety provisions an insurer asks for can change the real number, which is why a survey by an installer, not a calculation, fixes a final layout. This site does not survey roofs.

Why 50kW is the line that matters on cost

The Energy Act 2004 defines microgeneration as generating plant with a capacity not exceeding 50 kilowatts (section 82(6) and (8)). That line shows up twice in commercial solar cost. First, it is where official price data stops: DESNZ's installed-cost statistics come from systems registered on the Microgeneration Certification Scheme database, which in practice means installations up to 50kW, so the 10–50kW median of £1,204 per kW in 2025/26 is the nearest official benchmark and nothing public covers 100kW or 500kW systems (DESNZ, Small scale solar PV cost data). Second, in England it is where planning changes: rooftop solar on a non-domestic building is permitted development under Class J of Part 14 of the 2015 General Permitted Development Order, but above 50kW the council's prior-approval decision on design and appearance, including glare, is also needed before work starts (Class J, Part 14). Neither moves the price per kWp much, but both are reasons a quote above 50kW needs a written scope.

How to use a price per kWp to test a quote

  1. Find the panel schedule. Count of panels × wattage per panel, divided by 1,000, gives the real kWp. Ignore the headline size if the schedule says otherwise.
  2. Take VAT out. Commercial installations carry 20% VAT, which VAT-registered businesses recover. The zero rate that runs to 31 March 2027 covers homes and some charity buildings, not business premises, so compare quotes excluding VAT.
  3. Divide. Total price excluding VAT ÷ real kWp = price per kWp. Divide by 1,000 for pence per watt.
  4. Compare with the band for the size. The ladder runs from about £1,000 per kWp at 30kW down to about £725 at 500kW, and each size has its own guide: 30kW, 50kW, 100kW, 250kW, 500kW.
  5. If it is outside the band, ask why. Above the band, ask what is included; below, ask what is left out (scaffolding, the G99 application, structural sign-off, export limitation, monitoring). A fixed price against a written scope is the only number worth comparing.

Two quotes for a "100kW" roof

The same 100kW headline can hide a different system. Both quotes below are illustrative arithmetic, not real quotations.

QuoteHeadline sizePanel scheduleReal kWpPrice per kWp, excluding VATAgainst the 100kW band (£800–£950)
A100kW220 × 455W100.1£87,500 ÷ 100.1 = £874Inside the band
B100kW240 × 455W109.2£82,000 ÷ 109.2 = £751Below the band: check the scope for exclusions
B, divided by the headline100kW—100.0£82,000 ÷ 100 = £820Looks inside the band, which is the mistake

Quote B looks dearer per kW than the band if you divide by the headline, but it buys 9% more panel. Counted properly it is below the band, which is a reason to read the exclusions line by line rather than a reason to celebrate. The quote checker on the benchmark page does the division and the band comparison for you.

Common mix-ups on a quote

  • kW and kWp swapped. If a quote gives only one size, ask whether it is the panel total (DC, kWp) or the inverter rating (AC, kW).
  • Price per panel. A low price per panel can still be a high price per kWp if the panels are low-wattage. Only the per-kWp figure compares like with like.
  • kWh promised as kWp. Annual generation is a forecast that depends on the roof; kWp is a rating of the equipment. A quote should state both and say how the forecast was made.
  • Quotes with and without VAT. A 20% difference between two quotes may be nothing more than one of them including VAT.
  • Different scope, same size. Scaffolding, access, G99, structural work and monitoring are the usual differences. The nine price factors explain each line.

For prices by sector see cost by sector; for industrial roofs, industrial solar panel cost; for the trend behind the numbers, the UK commercial solar price trend. To see what these panel ratings mean for the bill, the home page sets out commercial solar panels cost by size.

Sources and last verified

Last verified 29 October 2026. The price ranges for 30kW to 500kW are this site's own estimates, not quotations. The unit definitions and thresholds come from the sources below; the panel, roof-area and price arithmetic is shown in the text.

Cite this page: Commercial Solar Cost UK (2026). What is kWp? commercialsolarcostuk.co.uk/what-is-kwp/ (last verified 29 October 2026).

KWP QUESTIONS

kWp: common questions

What does kWp stand for?

Kilowatt-peak: the DC power an array of panels is rated to produce under standard test conditions of 1,000W of sunlight per square metre at a panel temperature of 25°C.

Is kWp the same as kW?

No. kWp is the rating of the panels (DC); kW on an inverter datasheet is the AC power it can deliver. A system can have more kWp of panels than kW of inverter, so check the panel schedule when comparing quotes.

How many solar panels make 1 kWp?

About 2.2 panels of 455W (1,000 ÷ 455). So 30kWp is about 66 panels, 100kWp about 220 and 500kWp about 1,099. Panels of a different wattage change the count, not the kWp.

How much roof does 1 kWp need?

This site's size guides assume 4.5 to 5 square metres of clear roof per kWp, so 100kWp needs about 450 to 500 square metres. That is arithmetic for planning, not a survey: layout, walkways and fire-safety setbacks change the real figure.

What is a good price per kWp for commercial solar?

£650 to £1,100 per kWp installed in 2026, excluding VAT, falling as systems get larger: about £1,000 at 30kW, £875 at 100kW and £725 at 500kW. The cost per kWp benchmark checks those ranges against the Government's own installed-cost data.

Get an indicative commercial solar price for your building

Tell us the building, the roof and what you spend on electricity. We reply by email with an indicative price band based on the 2026 ranges published on this site. A fixed price needs a survey by an installer; this site does not survey roofs.

System size you are pricing

By submitting, you agree to our privacy policy. We'll never sell your details.